Workflow Task Recognition Algorithm Based on Intelligent Planning
ZENG Lin1,2, ZHUO Han-kui1, LI Lei1
1. School of Data and Computer Science, Sun Yat-sen University, Guangzhou, Guangdong 510006, China;
2. School of Mathematics and Computer Science, Hezhou University, Hezhou, Guangxi 542899, China
Abstract:For traditional algorithms,activities are treated as events that are independent from each other and cannot be accurately identified,we propose a workflow task recognition algorithm based on intelligent programming,which utilizes the commonality of workflow and intelligent planning in the implementation of sequence and operation rules.Through the high-level abstract description,we can deduce the intrinsic logic relation between them automatically,and also explore potential knowledge from outside information,and transform the workflow task recognition problem into the corresponding planning recognition problem,and solve the problem that the traditional algorithm is difficult in recognition and sensitive to the noise data.Experimental results show that our algorithm is feasible.
[1] Dumas,Marlon,et al.Process-Aware Information Systems:Bridging People and Software Through Process Technology[M].New Jersey:John Wiley & Sons,2005.
[2] Fan Shaokun,Lele Kang,Leon Zhao.Workflow-aware attention tracking to enhance collaboration management[J].Information Systems Frontiers,2015,17(6):1253-1264.
[3] Qanbari Soheil,Fei Li,Schahram Dustdar.Toward portable cloud manufacturing services[J].IEEE Internet Computing,2014,18(6):77-80.
[4] Völter Markus,et al.Model-Driven Software Development:Technology,Engineering,Management[M].New Jersey:John Wiley & Sons,2013.
[5] Eliceiri Kevin,et al.Biological imaging software tools[J].Nature methods,2012,9(7):697-710.
[6] Branco Moisés Castelo,et al.A case study on consistency management of business and IT process models in banking[J].Software & Systems Modeling,2014,13(3):913-940.
[7] 孙瑞志,史美林.一个支持动态变化的工作流元模型[J].电子学报,2002,30(S1):2052-2056. SUN Rui-zhi,SHI Mei-lin.A meta-model supporting dynamic changing workflow[J].Acta Electronica Sinica,2002,30(S1):2052-2056.(in Chinese)
[8] Costa Lauro Beltrão,et al.The case for workflow-aware storage:An opportunity study[J].Journal of Grid Computing,2015,13(1):95-113.
[9] Yan Yan,et al.Egocentric daily activity recognition via multitask clustering[J].IEEE Transactions on Image Processing,2015,24(10):2984-2995.
[10] Boiman Oren,Michal Irani.Detecting irregularities in images and in video[J].International Journal of Computer Vision,2007,74(1):17-31.
[11] Khalid Shehzad,Usman Akram,Shahid Razzaq.Behaviour recognition using multivariate m-mediod based modelling of motion trajectories[J].Multimedia Systems,2015,21(5):485-505.
[12] Geib Christopher,Robert P Goldman.A probabilistic plan recognition algorithm based on plan tree grammars[J].Artificial Intelligence,2009,173(11):1101-1132.
[13] Avrahami-Zilberbrand Kaminka.Fast and Complete Symbolic Plan Recognition[A].Proceedings of the 19th International Joint Conference on Artificial Intelligence[C].Burlington:Morgan Kaufmann,2005.653-658.
[14] Ramirez Geffner.Plan recognition as planning[A].Proceedings of the 21st International Joint Conference on Artificial Intelligence[C].Burlington:Morgan Kaufmann,2009.1778-1783.
[15] Yang Qiang,Kangheng Wu,Yunfei Jiang.Learning action models from plan examples using weighted MAX-SAT[J].Artificial Intelligence,2007,171(2-3):107-143.
[16] Hoffmann Jörg.FF:The fast-forward planning system[J].AI magazine,2001,22(3):57-62.
[17] Voulodimos Athanasios,et al.A dataset for workflow recognition in industrial scenes[A].Proceedings of the 18th IEEE International Conference on Image Processing[C].Piscataway:IEEE,2011.3249-3252.
[18] Han Wook-Shin,et al.iGraph:a framework for comparisons of disk-based graph indexing techniques[A].Proceedings of the VLDB Endowment[C].California:PVLDB,2010.449-459.
[19] Karpas Erez,Carmel Domshlak.Cost-optimal planning with landmarks[A].Proceedings of the 21st International Joint Conference on Artificial Intelligence[C].Burlington:Morgan Kaufmann,2009.1728-1733.