Your Location:
Home >
Browse articles >
Task Scheduling Algorithm Based on Dynamic Potential Game for Edge Compute First Networking
PAPERS | Updated:2026-04-10
    • Task Scheduling Algorithm Based on Dynamic Potential Game for Edge Compute First Networking

    • ZHANG Jing , GUAN Jian-feng , LIU Ke-xian , SHEN Ao
    • ACTA ELECTRONICA SINICA Vol. 53, Issue 1, Pages: 221-237(2025)
    • DOI: 10.12263/DZXB.20240401     

      CLC:
    • Revised:2024-09-26 ,

    Scan QR Code

  •  
  •  
  • Full Text(HTML)

  • Figs( 19 ) Tabs( 4 )

  • References

  • Publication Info

  • Metrics

Sections
icon
The trial reading is over, you can activate your VIP account to continue reading.
Deactivate >
icon
The trial reading is over. You can log in to your account, go to the personal center, purchase VIP membership, and read the full text.
Already a VIP member?
Log in >

179

Views

296

Downloads

2

CSCD

Alert me when the article has been cited
Submit
Tools
  • BibTeXDownload
  • EndnoteDownload
  • RefMan Download
  • NoteExpressDownload
  • NoteFirstDownload

Related Articles

A Time-Constraint-Driven Graph Reinforcement Learning Method for Task Scheduling in Relay Satellite
Embodied Intelligent Anti-Jamming Communication Strategy Generation Method Co-Driven by General Knowledge and Specialized Information
Task Segmentation and Path Optimization in Heterogeneous Cloud-Edge-End Computing Power Network
Knowledge-Augmented Grounded Image Narrative Generation
Research on Novel Threshold Voltage Modulation Technology Based on LaFMD Treatment

Related Author

SONG Bin
CHANG Jiangdong
QI Peihan
LIU Zhihao
SUN Wen
LIANG Linlin
MA Bo
YU Ying-jie

Related Institution

State Key Laboratory of Integrated Services Networks, Xidian University
ZTE Corporation
Xidian University
School of Information and Electronic Engineering, Zhejiang Gongshang University
College of Computer, Nanjing University of Posts and Telecommunications