<FONT face=Verdana><FONT face=Verdana>Risk of requirement is ignored in Tropos model.To analysis risks and relationships of requirements
a method analyzing risks in requirement phase is introduced.It's on the base of Tropos model
and proposes a Tropos goal gram-based framework of requirement relationship to identify risk factors of requirements:stakeholder
environment
technology and complexity of requirement and assess risk about feasibility of requirements.Because of subjectivity
these risk factors are assessed by relative experts.It is proved by nexample of train subsystem that the method can identify stakeholders and requirement with risk in time.This makes it earlier to solve risks and saves cost of project.