您当前的位置:
首页 >
文章列表页 >
Task Scheduling Algorithm Based on Dynamic Potential Game for Edge Compute First Networking
PAPERS | 更新时间:2025-12-11
    • Task Scheduling Algorithm Based on Dynamic Potential Game for Edge Compute First Networking

    • ACTA ELECTRONICA SINICA   Vol. 53, Issue 1, Pages: 221-237(2025)
    • DOI:10.12263/DZXB.20240401    

      CLC: TP393.1;
    • Received:06 May 2024

      Revised:2024-09-26

      Published:25 January 2025

    移动端阅览

  • ZHANG Jing, GUAN Jian-feng, LIU Ke-xian, et al. Task Scheduling Algorithm Based on Dynamic Potential Game for Edge Compute First Networking[J]. Acta Electronica Sinica, 2025, 53(01): 221-237. DOI:10.12263/DZXB.20240401

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

12

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Task Segmentation and Path Optimization in Heterogeneous Cloud-Edge-End Computing Power Network
A Dynamic Task Scheduling for Wireless Sensor and Actuator Networks
Nash Equilibrium Based Task Scheduling Algorithm of Multi-schedulers in Grid Computing

Related Author

LI Chuan-huang
MA Bo
YU Ying-jie
WU Sha-chen
NI Chang
LU Qin
CHEN Chao
SHI Wei

Related Institution

School of Information and Electronic Engineering, Zhejiang Gongshang University
State Key Laboratory for Novel Software Technology at Nanjing UniversityNanjingJiangsu 210093China
College of ComputerNanjing University of Posts and TelecommunicationsNanjingJiangsu 210003China
State Key Laboratory for Novel Software Technology at Nanjing University
College of Computer, Nanjing University of Posts and Telecommunications
0