To solve the contradiction of the scheduling success rate (SSR)
the time shifting rate (TSR) and the algorithm timeliness in the task scheduling of phased array radar
this paper proposes a scheduling algorithm based on the branch and bound method (BBM).Firstly
this algorithm acquires all executable tasks from available scheduling results
i.e.
obtaining several nodes on multiple layers
and forms several optional branches with these nodes through multistep recursion.In this way
the range of solution space is extended
and the algorithm performance is improved.Then
this algorithm discards branches with low yield and keeps the solution space to a certain range
which improves the accuracy of the algorithm and reduces the calculation amount.The simulation experiment indicated that compared with the algorithm based on integrated priority The simulation experiment suggested that the proposed algorithm enjoyed a 52% increase in scheduling success rate(SSR) over the traditional integrated priority algorithm
experienced a 61% reduction in the time shifting rate(TSR) compared with the time pointer algorithm
and took only 1~2% of the time consumed by the genetic algorithm.