您当前的位置:
首页 >
文章列表页 >
An Edge Transition Delay Based Pre-Bond TSV Testing Method
更新时间:2025-07-16
    • An Edge Transition Delay Based Pre-Bond TSV Testing Method

    • Acta Electronica Sinica   Vol. 47, Issue 11, Pages: 2278-2283(2019)
    • DOI:10.3969/j.issn.0372-2112.2019.11.006    

      CLC: TP306.2
    • Published Online:25 November 2019

      Published:2019

    移动端阅览

  • NI Tian-ming, CHANG Hao, BIAN Jing-chang, et al. An Edge Transition Delay Based Pre-Bond TSV Testing Method[J]. Acta Electronica Sinica, 2019, 47(11): 2278-2283. DOI: 10.3969/j.issn.0372-2112.2019.11.006.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

130

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on Design for Testability of BiCMOS Circuits

Related Author

叶波
郑增钰

Related Institution

State Key Laboratory of ASIC & System,Fudan University,Dept.of Electronic Engineering,Fudan University
复旦大学电子工程系
复旦大学专用集成电路与系统国家重点实验室复旦大学电子工程系
0