[1] Miranda S L C,Baker C J,Woodbridge K,et al.Comparison of scheduling algorithms for multifunction radar[J].IET Radar,Sonar & Navigation,2007,1(6):414-424.
[2] Orman A J,Potts C N,Shahani A K,et al.Scheduling for a multi-function phased array radar system[J].European Journal of Operational Research,1996,90:13-25.
[3] 曾光,卢建斌,胡卫东.多功能相控阵雷达自适应调度算法研究[J].现代雷达,2004,26(6):14-18. Zeng G,Lu J B,Hu W D.Research on adaptive scheduling algorithm for multifunction phased array radar[J].Modern Radar,2004,26(6):14-18.(in Chinese)
[4] BULTER J M.Multi-function Radar Tracking and Control[D].London:UCL University of London,1998.
[5] Reinoso-rondinel R,Yu T Y,Torres S.Multifunction phased-array radar:Time balance scheduler for adaptive weather sensing[J].Journal of Atmospheric and Oceanic Technology,2010,27(11):1854-1867.
[6] HUIZING A G,BLOEMEN A A F.An efficient scheduling algorithm for a multifunction radar[A].Proceedings of IEEE International Symposium on Phased Array Systems and Technology-Revolutionary Developments in Phased Arrays[C].IEEE,1996.359-364.
[7] Jimenze M I,Izquierdo A,Villacorta J J,et al.Analysis and design of multifunction radar task schedulers based on queue[A].Proceedings of 28th Digital Avionics Systems Conference[C].IEEE/AIAA Press,2009.295-302.
[8] Jimenze M I,Del Val L,Villacorta J J.Design of task scheduling process for a multifunction radar[J].IET Radar,Sonar and Navigation,2012,6(5):341-347.
[9] 卢建斌,胡卫东,郁文贤.多功能相控阵雷达实时任务调度研究[J].电子学报,2006,34(4):732-736. Lu J B,Hu W D,Yu W X.Research on real-time scheduling algorithm for multifunction phased array radar[J].Acta Electronica Sinica,2006,34(4):732-736.(in Chinese)
[10] LU J B,XIAO H,XI Z M,et al.Multifunction phased array radar resource management:real-time scheduling algorithm[J].Journal of Computational Information Systems,2011,7(2):385-393.
[11] LU J B,XIAO H,XI Z M,et al.Phased array radar resource management:task scheduling and performance evaluation[J].Journal of Computational Information Systems,2013,9(3):1131-1138.
[12] 陈怡君,罗迎,张群,等.基于认知ISAR成像的相控阵雷达资源自适应调度算法[J].电子与信息学报,2014,36(7):1566-1572. CHEN Y J,LUO Y,ZHANG Q,et al.Adaptive scheduling algorithm for phased array radar based on cognitive ISAR imaging[J].Journal of Electronics & Information Technology,2014,36(7):1566-1572.(in Chinese)
[13] Chen Y J,Zhang Q,Yuan N,et al.An adaptive ISAR-imaging-considered task scheduling algorithm for multi-function phased array radars[J].IEEE Transactions on Signal Processing,2015,63(19):5096-5110.
[14] Galati G,Piracci E G.Scheduling methods for a conformal,phased array multifunction radar[A].Proceedings of the Second International Conference on Advances in Information Processing and Communication Technology[C].IEEE Press,2015.103-108.
[15] Galati G,Madia F,Carta P,et al.Time for a change in phased array radar architectures-Part Ⅱ:the d-radar[A].Proceedings of the Second International Conference on Advances in Information Processing and Communication Technology[C].IEEE Press,2015.918-923.
[16] Lee C G,Kang P S,Shih C S,et al.Schedulability envelope for real-time radar dwell scheduling[J].IEEE Transactions on Computers,2006,55(12):1599-1613.
[17] Gopalakrishnan S,Caccamo M,Shih C S,et al.Finite-horizon scheduling of radar dwells with online template construction[J].Real-Time Systems,2006,33(1):47-75.
[18] Gopalakrishnan S,Caccamo M,Sha L.Sharp thresholds for scheduling recurring tasks with distance constraints[J].IEEE Transactions on Computers,2008,57(3):344-358.
[19] Cheng T,He Z S,Tang T.Novel radar dwell scheduling algorithm based on pulse interleaving[J].Journal of Systems Engineering and Electronics,2009,20(2):247-253.
[20] Cheng T,Liao W W,He Z S.MIMO radar dwell scheduling based on novel pulse interleaving technique[J].Journal of Systems Engineering and Electronics,2013,24(2):234-241.
[21] 叶朝谋,丁建江,俞志强,等.基于周期分区的相控阵雷达任务交叉调度研究[J].电子与信息学报,2014,36(2):435-440. YE Z M,DING J J,YU Z Q,et al.Study on task interleaving scheduling of phased array radar based on period division[J].Journal of Electronics & Information Technology,2014,36(2):435-440.(in Chinese)
[22] Mir H S,Abdelaziz F B.Cyclic task scheduling for multifunction radar[J].IEEE Transactions on Automation Science and Engineering,2012,9(3):529-537.
[23] Mir H,Guitouni A.Variable dwell time task scheduling for multifunction radar[J].IEEE Transactions on Automation Science and Engineering,2014,11(2):463-472.
[24] 张浩为,谢军伟,师俊朋,等.饱和时序下防空相控阵雷达动态优先级调度方法[J].北京航空航天大学学报,2016,42(12):2722-2729. ZHANG H W,XIE J W,SHI J P,et al.Dynamic priority scheduling for phased array radar in overload situations[J].Journal of Beijing University of Aeronautics and Astronautics,2016,42(12):2722-2729.(in Chinese)
[25] Ghosh S,Hansen J,Rajkumar R,et al.Integrated resource management and scheduling with multi-resource constraints[A].Proceedings of the 25th IEEE International Real-Time Systems Symposium[C].IEEE,2004.12-22. |