[1] Orman A J,Potts C N,Shahani A K,et al.Scheduling for a multi-function phased array radar system[J].European Journal of Operational Research,1996,90(1):13-25.
[2] Sgambato P,Celentano S,Di Dio C.A flexible on-line scheduling algorithm for multifunctional radar[A].Proceedings of 2016 IEEE Radar Conference[C].Philadelphia,PA,USA:IEEE,2016.1-5.
[3] Butler J M.Multi-function Radar Tracking and Control[D].London:UCL University of London,1998.
[4] Reinoso-Rondinel R,Yu T Y,Torres S.Multifunction phased-array radar:Time balance scheduler for adaptive weather sensing[J].Journal of Atmospheric and Oceanic Technology,2010,27(11):1854-1867.
[5] Huizing A G,Bloemen A A F.An efficient scheduling algorithm for a multifunction radar[A].IEEE International Symposium on Phased Array Systems and Technology-Revolutionary Developments in Phased Arrays[C].Boston,USA:IEEE,1996.359-364.
[6] JimenezM I,del Val L,Villacorta J J.Design of task scheduling process for a multifunction radar[J].IET Radar,Sonar and Navigation,2012,6(5):341-347.
[7] 陈怡君,罗迎,张群,等.基于认知ISAR成像的相控阵雷达资源自适应调度算法[J].电子与信息学报,2014,36(7):1566-1572. Chen Y J,Luo Y,Zhang Q,et al.Adaptive scheduling algorithm for phased array radar based on cognitive ISAR imaging[J].Journal of Electronics & Information Technology,2014,36(7):1566-1572.(in Chinese)
[8] Chen Y J,Zhang Q,Yuan N,et al.An adaptive ISAR-imaging-considered task scheduling algorithm for multi-function phased array radars[J].IEEE Transactions on Signal Processing,2015,63(19):5096-5110.
[9] 张浩为,谢军伟,师俊朋,等.饱和时序下防空相控阵雷达动态优先级调度算法[J].北京航空航天大学学报,2016,42(12):2722-2729. Zhang H W,Xie J W,Shi J P,et al.Dynamic priority scheduling algorithm for air defense phased array radar in overload situations[J].Journal of Beijing University of Aeronautics and Astronautics,2016,42(12):2722-2729.(in Chinese)
[10] Zhang H W,Xie J W,Zong B F,et al.Dynamic priority scheduling method for the air-defence phased array radar[J].IET Radar,Sonar & Navigation,2017,11(7):1140-1146.
[11] Gopalakrishnan S,Caccamo M,Shih C S,et al.Finite-horizon scheduling of radar dwells with online template construction[J].Real-Time Systems,2004,33(1-3):47-75.
[12] Lee C G,Kang P S,Shih C S,et al.Schedulability envelope for real-time radar dwell scheduling[J].IEEE Trans Comp,2006,55(12):1599-1613.
[13] Gopalakrishnan S,Caccamo M,Sha L.Sharp thresholds for scheduling recurring tasks with distance constraints[J].IEEE Trans Comp,2008,57(3):344-358.
[14] Cheng T,He Z S,Tang T.Novel radar dwell scheduling algorithm based on pulse interleaving[J].Journal of Systems Engineering and Electronics,2009,20(2):247-253.
[15] Mir H,Guitouni A.Variable dwell time task scheduling for multifunction radar[J].IEEE Transactions on Automation Science and Engineering,2014,11(2):463-472.
[16] Abdelaziz F B,Mir H.An optimization model and tabu search heuristic for scheduling of tasks on a radar sensor[J].IEEE Sensors Journal,2016,16(17):6694-6702.
[17] Zhang H W,Xie J W,Ge J A,et al.A hybrid adaptively genetic algorithm for task scheduling problem in the phased array radar[J].European Journal of Operational Research,2019,272(3),868-878.
[18] Zhang H W,Xie J W,Lu W L,et al.A scheduling method based on the hybrid genetic particle swarm algorithm for the multifunction phased array radar[J].Frontiers of Information Technology & Electronic Engineering,2017,18(11):1806-1816.
[19] Cheng T,He Z S,Li H Y.Adaptive dwell scheduling for digital array radar based on online pulse interleaving[J].Chinese Journal of Electronics,2009,18(3):574-578.
[20] 程婷,何子述,李会勇.一种数字阵列雷达自适应波束驻留调度算法[J].电子学报,2009,37(9):2025-2029. Cheng T,He Z S,Li H Y.An adaptive dwell scheduling algorithm for digital array radar[J].Acta Electronica Sinica,2009,37(9):2025-2029.(in Chinese)
[21] Baugh R A.Computer Control of Modern Radars[M].New York:RCA Corporation,1973.
[22] Ghosh S,Hansen J,Rajkumar R,et al.Integrated resource management and scheduling with multi-resource constraints[A].Proceedings of the 25th IEEE International Real-Time Systems Symposium[C].Lisbon,Portugal:IEEE,2004.12-22.
[23] Lu J B,Xiao H,Xi Z M,et al.Phased array radar resource management:task scheduling and performance evaluation[J].Journal of Computational Information Systems,2013,9(3):1131-1138.
[24] Tei W K,Yung S C,Chin F K,et al.Real-time dwell scheduling of component-oriented phased array radars[J].IEEE Trans Comp,2005,54(1):47-60. |